Commercial Case Study

Record UK Case Study

CASE STUDY

Record UK

Glasgow

Through the installation of a 288 kWp rooftop solar system, Record UK has transformed unused roof space into a long-term source of clean, reliable energy, helping reduce emissions while strengthening its energy resilience.

Automatic doors specialists Record UK has partnered with Forster Group to deliver a rooftop solar PV system at its headquarters and main production facility in Blantyre.

288

kWp

Rooftop Solar

Record Glasgow

The Challenge

As Record UK’s core manufacturing hub, the Blantyre facility plays a key role in producing the company’s automated door systems. Housing CNC machinery, fabrication, testing, and assembly, the site operates with naturally high electrical demand typical of industrial manufacturing.

“This is our largest energy consuming site, which meant it offered the greatest operational and sustainability impact.”

-James Simpson, Supply Chain Director at Record UK

Our Solution

From the outset, Record UK were clear that they wanted a solution that would fundamentally change the way they power their energy-intensive manufacturing operations. Through the installation of a 288 kWp rooftop solar system, the business has transformed unused roof space into a long-term source of clean, reliable energy, helping reduce emissions while strengthening its energy resilience.

“The whole process was hassle-free and well managed, with clear communication at every stage. The system has already delivered strong, reliable energy generation since going live. Integration with our wider facility infrastructure was seamless.”

-James Simpson

Outcome

227,400

kWh

annual energy generation

61

tonnes

yearly co2 savings

52%

offset

annual energy consumption

North East Contracts Case Study

North East Contracts

Arbroath

Forster Group completed the installation of a 16.4kWp roof-mounted system for in May 2023 for North East Contracts in Arbroath

Home for the commercial roofing and wall cladding company is a 314 sq ft building, providing office space and a workshop. Keen to reduce energy costs and maximise on the benefits of solar energy, they partnered up with Forster Group.

When we first started feeling the effects of the energy crisis, we were concerned that the rate of energy costs were continuing to increase. I felt there was a need to offset our energy and look into a more sustainable future.

Jacqueline Hacking, Managing Director

16

kWp

Rooftop Solar

north-east-contracts-photograph-case-study

The Challenge

North East Contracts came to Forster Group to deliver a solution that could offset day-to-day energy use across multiple office spaces, as well as periodic high-demand workshop use

When we first started feeling the effects of the energy crisis, we were concerned that the rate of energy costs were continuing to increase. I felt there was a need to offset our energy and look into a more sustainable future."

-Jacqueline Hacking, Managing Director

Our Solution

Having worked with Forster Group on several industrial roofing projects over the years, North East Contracts already had a trusted relationship with Forster Group. In May 2024, Forster Group completed tgeh installation of a 16.4kWp roof-mounted solar system and further supported North East Contracts in securing an intrest-free Business Energy Scotland government loan, allowing the company to fund the investment.

"We chose Forster Group for our solar installation after working together on several industrial roofing projects over the years. We have a longstanding relationship with them and trust their knowledge and experience of the solar energy field.”

Outcome

Over the first six months, the solar installation delivered an energy saving of 60% per month, with annual savings projected at approximately £2,000 off the company's energy bills.

North East Contracts also gained access to the manufacturer's online monitoring system, giving them real-time visibility of their energy generation and consumption.

"We’re thrilled with the performance of our solar installation so far and I will continue to recommend Forster Group as an established local company that knows the market. The technical team is incredibly helpful in providing analytical research to demonstrate cost savings and plan out the most effective solar solution to benefit their customers."

-Jacqueline Hacking, Managing Director

11,860

kWh

annual energy generation

5

tonnes

yearly co2 savings

£2000

reduction

monthly energy bills

Fife Creamery, Kirkaldy, Case Study

CASE STUDY

Fife Creamery

Kircaldy

Forster Group completed a major installation for Fife Creamery in July 2024, marking the company’s biggest project to date for a client in the food and drink industry. Following an investment of £230,000, Fife Creamery appointed Forster Group to install over 700 roof-mounted solar panels for its Innovation Hub and refrigeration warehouse in Kirkcaldy.

300

kWp

Rooftop Solar

fife-creamery-rooftop-solar-photograph

Our Solution

To support Fife Creamery in achieving its ambitious sustainability goals, Forster Group installed an energy storage battery at the firm’s Innovation Hub, as well as providing infrastructure to allow for additional battery storage in the future.

"With a high proportion of energy used for refrigeration, we were determined to secure the largest solar installation we could, ensuring that the renewable energy generated would directly offset our substantial energy consumption. It’s incredibly exciting to already be seeing positive results.”

- David Simpson, Operations Director

Outcome

215,627

kWh

annual energy generation

93

tonnes

yearly co2 savings

5

Years

payback period

Subscribe to our newsletter